
Weathering steel is mainly used in railway, vehicles, bridges, towers and other steel structures exposed to the atmosphere for a long time. weather resistant Q295NH steel. Weathering steel is used to make structural parts such as containers, railway vehicles, oil derricks, seaport construction, oil production platform and containers containing hydrogen sulfide corrosion medium in chemical petroleum equipment. Weathering steel has the characteristics of rust resistance, corrosion resistance, life extension, thinning and consumption reduction, labor saving and energy saving, which benefits the weathering steel component manufacturers and users.
After the steel plate is produced from the original factory, it will pass through a series of transportation and storage links and then be delivered to the processing workshop. During this period of time, the steel plate surface will contact with the air continuously, which will inevitably produce a layer of oxide skin. The oxide skin is a difficulty in the treatment process. It has high melting point, is not easy to burn and dissolve, increases preheating time, reduces cutting speed. Therefore, the surface of the weather resistant Q295NH steel plate should be derusted before cutting.
First to determine the welding methods, such as hand arc welding, submerged arc welding and tungsten argon arc welding, melting polar gas shielded welding machine, and so on are very many different kinds of weather resistant Q295NH steel welding method, can only be chosen according to specific situation, determine the welding method, and make welding process parameters, different kinds of welding process parameters, such as manual welding mainly includes: electrode model (or brand) diameter, current, voltage, welding power source type and polarity connection, welding layer number, number, inspection method, etc.
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.
Email:bb@bebonchina.com
Tel:0086-371-86151827
Skype:bebonchina